Construction

Social media for commercial and industrial builders, sorted.

A month of posts written for your line of work: the caption, the hashtags, what to photograph and the day to post. Answer six questions and the first month is free.

Get my free plan

Where your plan focuses

The platform and content mix SahiPost starts from for this trade. It is a starting point, not a rule.

Platforms

Instagram20%
Facebook15%
LinkedIn65%

What you post

Teach45%
Engage15%
Build trust30%
Sell10%

A sample post

This is the kind of post that lands in your plan, here for Instagram.

A SahiPost poster for commercial and industrial builders, made from the post "Myth: A shed is just columns and a roof.", with the business name, phone number and logo along the bottom
The poster SahiPost made for this post.

Myth: A shed is just columns and a roof. Fact: Floor loading, drainage, ventilation and fire safety all shape the design. Plan them early. Fixing them later costs far more.

#factoryshed #pebstructure #commercialconstructionindia #designandbuild

Photo brief. Split card: a bare steel frame labelled MYTH, a finished shed with floor markings, ventilators and fire lines labelled FACT.

Myths your customers believe

Posts that correct a myth earn trust. Your plan includes them, with your business name attached.

Myth. A shed is just columns and a roof

Fact. Floor loading, drainage, ventilation, fire safety and future expansion all need planning. Getting them wrong is expensive to fix later.

Myth. PEB is always cheaper than conventional steel

Fact. Pre-engineered buildings are often faster and economical for standard spans, but the right choice depends on design, loads and location.

Myth. Industrial floors are ordinary concrete

Fact. Floors for racks and forklifts need designed thickness, reinforcement, joints and surface hardening.

Myth. Fire norms can be handled after construction

Fact. Fire exits, hydrants and separation distances affect the design. Plan them from the start.

How to brief a commercial builder

  1. Describe operations, loads and equipment
  2. Share site details and future expansion plans
  3. State your target start date for operations

Questions your customers ask

How long does a warehouse or factory shed take?

It depends on size, design approvals and site conditions. We share a stage-wise schedule from design to handover.

Do you handle design as well as construction?

We work with structural consultants for design and build to approved drawings, or follow your consultant's drawings.

Can you plan for future expansion?

Yes. We design foundations, frames and services so expansion is easier later.

Do you help with approvals?

We help prepare documents and coordinate with consultants. Approvals are granted by the authorities.

What about industrial flooring?

We design floors for your racking and vehicle loads, with proper joints and surface finish.

How do you control cost?

A detailed BOQ, fixed scope, change orders in writing and monthly cost reviews.